Euro 2024 matches today

Home/Projects/Total/BP/Marathon – Canyon Express

Euro 2024 matches todayCanyon Express was an entity that was comprised of several companies that made a decision to produce three (3) marginal fields through one subsea piggable pipeline loop to new build host facility. The three fields and operators were:
BP Kings Peak MC173 & 217/DC 133&177
Marathon Camden Hills MC348
Total Aconcagua MC305
The water depth of these fields ranged from 6,600′ to 7,200′Euro 2024 qualifiers results today. Gas flow rate designed for is 500 mmcfd. Williams was selected to fabricate, install, and operate the Host Facility (Canyon Station).

RCI Project Engineers have worked on this project in the following capacities:

  • Deputy Project Manager/Technical Advisor for Host Facility and Subsea Interace to Host facility
  • Reviewed and approved specifications, drawings, and vendor awards for deck, jacket, and equipment
  • Reviewed, approved, and Euro 2024 matches todayparticipated in performance HAZID, HAZOP, and Hazard Analysis of subsea systems
  • Involved with all aspects of project from conception to startup. This includes onshore fabricaton and offshore installation, commissioning and startup

RCI Project Field Coordinators have worked on this project in the following capacities:

  • Responsible for all instrumentation and electrical QA/QC
  • Responsible for installation of jacket

Contact us