Home/Projects/bpTT – 42 Inch Pipeline Evaluation

RCI provided inspection and assessment services Euro Football results 2024on a 42 inch pipeline road crossing. The pipeline runs under the main road in a north/south direction inside the Galeota Plant site, known as Isthmus Road. bpTT had previously advised RCI that no weight limit existed for this road but did not have accurate data to prove or disprove that fact. RCI provided on site Euro 2024 matches todaymanagers and inspectors to gather data and make sound engineering recommendations.

Scope of Work:

  • Gather existing records where available.
  • Make site visits to gather physical data.
  • Analysis of the road way above the pipelines for possible overload.
  • Submit an inspection report and presentation for further review.